For outdoor activity equipment, the "building" link is often involved, and the building process is where the product is tested. If your product is not well done, then it is easy to have problems during the construction process, such as poorly built, but this does not rule out whether the construction method is correct. In the process of setting up the aluminum truss stage, people often made a lot of jokes because of incorrect settings.

Aluminum truss stage is abbreviated as aluminum truss stage, also called truss. It is a commonly used equipment for building lighting stages. It has a strong bearing capacity and can be hung with lights or large LED screens. Aluminum truss stage generally needs to be used with other auxiliary equipment. Commonly used accessories are square sleeve, square head, base, support, cross arm, hanging gourd, and reverse head.

Materials needed to build an aluminum truss stage: two sections of aluminum alloy column, one end of aluminum alloy beam, two square sleeves, two cross arms, two hanging gourds, two reverse heads, two bases, eight inclined supports, Straps, screws, etc.

Construction steps:

1. Place the four bases in a rough position on the ground first;

2. Insert the part under the diagonal support on the outside of each base;

3. Fix the reverse head on the base with screws;

4. Put a square sleeve on the reverse head;

5. Link the beams;

6. Butt-connect the two ends of the beam with the two square sleeves on both sides. At this time, the beam part is assembled on the ground;

7. Connect the column truss while lying flat, then screw one end to the reverse head, and the other end to the cross arm. At the same time, the hanging gourd and the cross arm are connected. The function of the gourd is to lift the cross beam truss below. ;

8. A group of people slowly erect the column truss together, taking care not to push the column with too much force, and then fix the screws on the reverse head;

9. After the column is erected, hook the hook under the hanging gourd to the beam underneath through the sling;

10. The four people slowly pull the hanging gourd together to pull the beam to the left and right positions of the person's head;

11. Install lighting and sound equipment on the beam;

12. 4 people together pull the hanging gourd to a predetermined height to stop;

13. Tighten one end of the diagonal support with the column, and the other end with the horizontal support of the base, so that the aluminum truss stage is built.